Stories

Cutting the Ribbon on Two New Central Arizona College Facilities

Central Arizona College (CAC) recently opened two new, ground-up facilities that DPR Construction delivered on its Signal Peak Campus in Coolidge, AZ: the Mel A. Everingham Student Union and a Science Building. CAC President Dr. Jackie Elliott, CAC Governing Board members, staff, students and the local community joined to celebrate the ribbon cutting ceremony as the new school year kicked off.

The new Student Union promises to be a new campus landmark and a destination for all students, enhancing the student experience with a modern campus hub. Architekton designed the 40,600-sq.-ft. facility to mirror the surrounding mountainous landscape with an undulating, angular roofline that provides a soaring open feel to the interior public space. The Student Union houses a full-service kitchen and cafeteria, a bookstore, student lounge, meeting rooms and the campus public safety office. An 8,900-sq.-ft outdoor seating and landscape area provides space for students to relax between classes and includes AV infrastructure to convert into an outdoor amphitheater to host large events, such as graduation.

The exterior view of the new Central Arizona College Student Union.
The new CAC Student Union's design takes cues from the surrounding landscape. Courtesy of Gregg Mastorakos

Just north of the new Student Union, the new two-story, 32,250-sq.-ft. Science Building offers students and faculty a Maker Space/STEM classroom with 3D printers and robotics, teaching labs, wet and dry labs, prep room and faculty offices.

“The efficient and functional learning space of the science building is designed to draw and engage students in a 21st Century educational atmosphere,” said Daniel Childers of Architekton. The building’s design offers nods to the surrounding desert with an outdoor garden and a water feature running through the building with roof drainage.

A dining area inside the new CAC Student Union
The new CAC Student Union enhances the student experience with a modern space for eating, studying and socializing. Courtesy of Gregg Mastorakos

It was critical for DPR to deliver both buildings in time for the start of a new school year. To help ensure the schedule was met, DPR used Digital Building Components, a Phoenix-based custom fabrication facility that uses robotic technology to precisely roll aluminum studs and build framing components. The CAC Science Building had all exterior panels fabricated at Digital Building Components and delivered sequentially for immediate installation at the project site, reducing the exterior skin installation time from four weeks down to a day and a half.

A science classroom at CAC featuring lab tables and fume hoods.
CAC students can take advantage of top notch facilities in the new science building. Courtesy of Gregg Mastorakos